well i am thinking when and if my engine goes i want to drop a 2.4 in my cavalier which has a 2200 SFI what do all i need engine,tranny *want to keep it a auto "don't ask"*,computer,engine wireing harness, harness for inside,a center console for the 4-speed,motor mounts. am i leaving out any thing? and is there any welding involved?
Basically yes...I think you got everything
www.kronosperformance.com / 732-742-8837
engine, tranny, PCM, and the harness from PCM to firewall. mounts are the same but i'd get a new set anyways.
I was a retard, and now I'm permanently banned.
engine, trans, engine harness, comp, power steering pump and power steering lines, fuel lines, my upper motor mount was different, if your going from a 3 spd to 4 spd, u might wanna look into the center consule and the 4 spd guage cluster. i think thats it...if i think of anything else, post back i will
Dude if youre gonna swap engines go ecotec, you won't be dissapointed
Jeff Marmus wrote:Dude if youre gonna swap engines go ecotec, you won't be dissapointed
^^ unintelligent post. sure, go for an ecotec if you want lots of downtime and fabrication.
I was a retard, and now I'm permanently banned.
2000ecocavalier wrote:downtime not really fabrication not really either mine was done within a matter of a week
a week is downtime. which classifies as a swap so to speak. as far as an originally placed motor (i.e. 2.2 to 2200 or 2.2 to 2.4) we usually get done in 2 days
I was a retard, and now I'm permanently banned.
i can't go ecotec this is my daily driver for now so i am going to get part by part and take a few days off to get it done
Larry Martin wrote:i can't go ecotec this is my daily driver for now so i am going to get part by part and take a few days off to get it done
completely understandable man. and the 2.4 will work just fine for that. if you figure it's going to take you 2 days, request off 4. if you figure it's going to take you 4, request off a week. when we put together our turbo sedan, we estimated 3 days for the project. little things going wrong and tuning issues led to the project taking 8 full days.
I was a retard, and now I'm permanently banned.